1. Participation in the modernization program of units 5 and 6 of Kozloduy NPP, subcontract with Framatom – Updated Technical Safety Case (ATSC).
  2. Project Management and Engineering Services Unit at Kozloduy NPP for decommissioning tasks of units 1 and 2 (Subcontractor of BNFL/EDF).
  3. Development of a Technical Design for Radioactive Waste Processing and Storage Facilities for the Novi Khan-2 National Repository, EuropeAid/116740/D/SV/BG (together with Empresarios Agrupados, Spain).
  4. Study of the power reduction regimes when switching off two of the two turbo-feed pumps of units 5 and 6 at Kozloduy NPP – contract with GRS, Germany.
  5. Development of an additional package to the technical safety justification (TSF) of units 3 and 4 of the Kozloduy NPP and justification of a large leak mode LOCA 2xDu 500 as a design basis accident.
  6. Analysis and justification of the need to assess the residual resource of the building structures, systems, facilities and components in a spent nuclear fuel storage facility (SNF).
  7. Increasing the operational reliability of the main steam pipeline “superheated steam” in the section Outlet collector of KPP-II – tee junction “balance main steam pipeline – KA-9, KA-12, KA-10” – TPP “Maritsa Iztok 2”.
  8. Detailed design for installation and connection of a new ignition reduction cooling device (RROU) of EC 1 and EC 2” for Sofia-East Thermal Power Plant.
  9. Technical solution and Detailed design for strengthening the pipelines necessary for performing steam purging of unit 1 and unit 2 of Maritsa East 2 TPP
  10. Performing strength calculation of transition to 5ТQ40S08 and 5ТQ40S09 – units 5 and 6 of Kozloduy NPP (emergency and planned primary circuit cooling system)
  11. Design of a bypass pipeline of the UM system in a heat distribution station – Kozloduy NPP
  12. Detailed design of a new support and suspension system of oil pipelines from SA51 to SC51D41,42 and from SA52 to SC52D41,42 – Units 5 and 6 of Kozloduy NPP
  13. Replacement of control valves 5RN81S01, 5RN82S01, 5RN91S01, 5RN92S01, 5RN11S02, 5RN12S02, 5RN21S06, 5RN22S06 of the RN system – Units 5 and 6 of Kozloduy NPP
  14. Detailed design of a steel chimney with H+38.6m for cogeneration capacity 32 MW – District Heating – Pleven
  15. Development of technical documentation for permission to make changes to the design of a StBK container for transportation and storage of processed radioactive waste of Kozloduy NPP
  16. Development of an updated strategy for decommissioning of Units 1 to 4.

Trainings

Future in Energy industry!

We created the internship program in line with our mission to build a better future for young people in Bulgaria. We strive to provide employment in a dynamic and innovative environment, to support hard work, ambition and talent.

  • ENPRO Consult Ltd. gives students of Nuclear Energy and Thermal Power Engineering the opportunity to work in the company's office and get to know the business up close. The duration of the internships is 3 months (July, August and September). The deadline for submitting documents is the end of June each calendar year.

See what you will get if you intern with us:

Training from some of the best professionals in the energy industry

Development of skills through a variety of tasks and projects

Working with modern technologies and innovative methods

Spirit of cooperation and support in close-knit teams

Individual program

Constant feedback from a personal mentor

Monthly remuneration

Opportunity for a longer-term commitment to the company

Requirements for candidates:

– To be students in the 2nd, 3rd and 4th year, studying the specialty "Thermal Power Engineering or Nuclear Power Engineering"

– To have a minimum GPA of 4.00 in the last semester;

– To show high motivation and desire for development, as well as high personal discipline.

Application documents

  1. Motivation letter for applying for the program, for development in the relevant field, interests and extracurricular activities/projects and professional experience.
  2. Certificate from the Technical University - city Sofia or Sofia University "Kliment Ohridski" that for the current academic year the student is enrolled in a full-time form of study in one of the specified programs.
  3. A copy of a bachelor's degree diploma or a certificate of completion of a degree with a calculated average grade point average. For applicants after the first semester of the master's program, an additional certificate with a calculated average grade point average for the semester before application is required.

Only candidates approved on the basis of documents will be invited to an interview.

ENPRO Consult OOD informs you that some of the voluntarily provided data are personal and fall under a special protection regime within the meaning of Regulation 2016/679 and the Personal Data Protection Act. The personal data provided will be processed to achieve legally permitted purposes related to this internship, as well as to realize the legitimate interests of the personal data administrator. ENPRO Consult OOD processes, stores and uses the voluntarily provided personal data within the legally regulated deadlines, ensuring their security and confidentiality.

Thank you for your interest and we look forward to your applications.

Certificates