{"id":780,"date":"2025-01-30T11:45:48","date_gmt":"2025-01-30T11:45:48","guid":{"rendered":"https:\/\/confident-cray.95-217-139-27.plesk.page\/?page_id=780"},"modified":"2025-04-08T16:42:23","modified_gmt":"2025-04-08T16:42:23","slug":"2005-2006","status":"publish","type":"page","link":"https:\/\/enproco.com\/en\/projects\/2005-2006\/","title":{"rendered":"2005-2006"},"content":{"rendered":"<ol>\n<li>Participation in the modernization program of units 5 and 6 of Kozloduy NPP, subcontract with Framatom &#8211; Updated Technical Safety Case (ATSC).<\/li>\n<li>Project Management and Engineering Services Unit at Kozloduy NPP for decommissioning tasks of units 1 and 2 (Subcontractor of BNFL\/EDF).<\/li>\n<li>Development of a Technical Design for Radioactive Waste Processing and Storage Facilities for the Novi Khan-2 National Repository, EuropeAid\/116740\/D\/SV\/BG (together with Empresarios Agrupados, Spain).<\/li>\n<li>Study of the power reduction regimes when switching off two of the two turbo-feed pumps of units 5 and 6 at Kozloduy NPP &#8211; contract with GRS, Germany.<\/li>\n<li>Development of an additional package to the technical safety justification (TSF) of units 3 and 4 of the Kozloduy NPP and justification of a large leak mode LOCA 2xDu 500 as a design basis accident.<\/li>\n<li>Analysis and justification of the need to assess the residual resource of the building structures, systems, facilities and components in a spent nuclear fuel storage facility (SNF).<\/li>\n<li>Increasing the operational reliability of the main steam pipeline &#8220;superheated steam&#8221; in the section Outlet collector of KPP-II &#8211; tee junction \u201cbalance main steam pipeline \u2013 KA-9, KA-12, KA-10\u201d &#8211; TPP \u201cMaritsa Iztok 2\u201d.<\/li>\n<li>Detailed design for installation and connection of a new ignition reduction cooling device (RROU) of EC 1 and EC 2\u201d for Sofia-East Thermal Power Plant.<\/li>\n<li>Technical solution and Detailed design for strengthening the pipelines necessary for performing steam purging of unit 1 and unit 2 of Maritsa East 2 TPP<\/li>\n<li>Performing strength calculation of transition to 5\u0422Q40S08 and 5\u0422Q40S09 \u2013 units 5 and 6 of Kozloduy NPP (emergency and planned primary circuit cooling system)<\/li>\n<li>Design of a bypass pipeline of the UM system in a heat distribution station &#8211; Kozloduy NPP<\/li>\n<li>Detailed design of a new support and suspension system of oil pipelines from SA51 to SC51D41,42 and from SA52 to SC52D41,42 &#8211; Units 5 and 6 of Kozloduy NPP<\/li>\n<li>Replacement of control valves 5RN81S01, 5RN82S01, 5RN91S01, 5RN92S01, 5RN11S02, 5RN12S02, 5RN21S06, 5RN22S06 of the RN system &#8211; Units 5 and 6 of Kozloduy NPP<\/li>\n<li>Detailed design of a steel chimney with H+38.6m for cogeneration capacity 32 MW &#8211; District Heating &#8211; Pleven<\/li>\n<li>Development of technical documentation for permission to make changes to the design of a StBK container for transportation and storage of processed radioactive waste of Kozloduy NPP<\/li>\n<li>Development of an updated strategy for decommissioning of Units 1 to 4.<\/li>\n<\/ol>\n","protected":false},"excerpt":{"rendered":"<p>Participation in the modernization program of units 5 and 6 of Kozloduy NPP, subcontract with Framatom &#8211; Updated Technical Safety Case (ATSC). Project Management and Engineering Services Unit at Kozloduy NPP for decommissioning tasks of units 1 and 2 (Subcontractor of BNFL\/EDF). Development of a Technical Design for Radioactive Waste Processing and Storage Facilities for [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":752,"menu_order":13,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_breakdance_hide_in_design_set":false,"_breakdance_tags":"","footnotes":""},"class_list":["post-780","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/enproco.com\/en\/wp-json\/wp\/v2\/pages\/780","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enproco.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/enproco.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/enproco.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/enproco.com\/en\/wp-json\/wp\/v2\/comments?post=780"}],"version-history":[{"count":3,"href":"https:\/\/enproco.com\/en\/wp-json\/wp\/v2\/pages\/780\/revisions"}],"predecessor-version":[{"id":783,"href":"https:\/\/enproco.com\/en\/wp-json\/wp\/v2\/pages\/780\/revisions\/783"}],"up":[{"embeddable":true,"href":"https:\/\/enproco.com\/en\/wp-json\/wp\/v2\/pages\/752"}],"wp:attachment":[{"href":"https:\/\/enproco.com\/en\/wp-json\/wp\/v2\/media?parent=780"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}