{"id":767,"date":"2025-01-30T11:43:32","date_gmt":"2025-01-30T11:43:32","guid":{"rendered":"https:\/\/confident-cray.95-217-139-27.plesk.page\/?page_id=767"},"modified":"2025-04-08T16:34:01","modified_gmt":"2025-04-08T16:34:01","slug":"2014-2015","status":"publish","type":"page","link":"https:\/\/enproco.com\/en\/projects\/2014-2015\/","title":{"rendered":"2014-2015"},"content":{"rendered":"<ol>\n<li>Project Management and Engineering Services Group at SE RAW for consultancy services for decommissioning tasks of units 1 to 4 and site selection, design, safety assessment, construction and commissioning location of the National Radioactive Waste Repository (Subcontractor of a Consortium with Empresarios Agrupados and Nuvia)<\/li>\n<li>Design and implementation of a system for heating and cooling the metal of the water chambers and tube sheets of high-pressure chamber-type heaters (PVN-K).<\/li>\n<li>Project for Modernization of the gas blowdown systems of units 5 and 6 of the Kozloduy NPP..<\/li>\n<li>Report on the safety analysis of a spent nuclear fuel repository (SRF) with \u201cunderwater\u201d storage technology (SRF OAB) and Report on the safety assessment of a SRF with \u201cunderwater\u201d storage technology (SRF OAB).<\/li>\n<li>Development of a detailed design for \u201cExpansion of a coke oven gas system in Duisburg Huckingen\u201d (Germany) for Enemona as the main contractor.<\/li>\n<li>Modernization of a radiation control system in a spent nuclear fuel repository (SRF), design part \u2013 subcontractor of Energo Service.<\/li>\n<li>Assessment of the capabilities of spray pools (BB) to preserve and maintain a sustainable material energy balance as thermal facilities, ensuring reliable cooling of the core under extreme weather conditions, Kozloduy NPP, units 5 and 6<\/li>\n<li>Specific analyses of the barriers to the spread of radioactive products during operation of the 3120 MW reactor installation, Kozloduy NPP, units 5 and 6.<\/li>\n<li>Modernization of control and management systems of Special Building 3 (SC-3)\u201d (Westinghouse subcontractor).<\/li>\n<li>Modernization of the control of radiation monitoring monitors type RTM860TS and delivery of monitors for radioactive contamination of the body with gamma and beta detectors.<\/li>\n<li>Design of a new support and suspension system for the pipelines in the trestles from SC-3 to units 5 and 6 of Kozloduy NPP.<\/li>\n<li>Detailed design for the installation of new pipelines for CNCG gases and condensate on trestle 1 and Conceptual design for pipelines on trestle 1 to a new HVO in Mondi EAD.<\/li>\n<li>Detailed design for installation of new heat exchangers TS10W01, 02, 03 and shut-off and drainage fittings on the lines of the technical water system, providing the possibility of shut-off and flushing of TS10W01 \u2013 03.<\/li>\n<li>Performing verification calculations for the behavior of the compensator of the collector of 6 steam collector of TG-9 subject to repair, Kozloduy NPP, Unit 5<\/li>\n<\/ol>\n","protected":false},"excerpt":{"rendered":"<p>Project Management and Engineering Services Group at SE RAW for consultancy services for decommissioning tasks of units 1 to 4 and site selection, design, safety assessment, construction and commissioning location of the National Radioactive Waste Repository (Subcontractor of a Consortium with Empresarios Agrupados and Nuvia) Design and implementation of a system for heating and cooling [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":752,"menu_order":4,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_breakdance_hide_in_design_set":false,"_breakdance_tags":"","footnotes":""},"class_list":["post-767","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/enproco.com\/en\/wp-json\/wp\/v2\/pages\/767","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enproco.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/enproco.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/enproco.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/enproco.com\/en\/wp-json\/wp\/v2\/comments?post=767"}],"version-history":[{"count":2,"href":"https:\/\/enproco.com\/en\/wp-json\/wp\/v2\/pages\/767\/revisions"}],"predecessor-version":[{"id":769,"href":"https:\/\/enproco.com\/en\/wp-json\/wp\/v2\/pages\/767\/revisions\/769"}],"up":[{"embeddable":true,"href":"https:\/\/enproco.com\/en\/wp-json\/wp\/v2\/pages\/752"}],"wp:attachment":[{"href":"https:\/\/enproco.com\/en\/wp-json\/wp\/v2\/media?parent=767"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}