1. “Design, delivery, installation and commissioning of emergency working and emergency evacuation lighting in buildings of Kozloduy NPP, units 5 and 6, with LED lighting fixtures”
  2. “Modernization of humps with an optimized profile for steam distribution mechanisms from the allocation of Turbogenerator 9 (TG-9), allowing for a larger stroke of the control valves”, Kozloduy NPP Unit 5
  3. “Update of “Technical and economic analysis for management of the infrastructure of general plant facilities and buildings, which is independent of units 1 to 4 of Kozloduy NPP. Part: Analysis for fluid supply”, related to the displacement of technical water pipelines group A from the second and third systems of unit 4 outside the Engine Room”
  4. Development of Regulatory Guide for deterministic safety analysis of nuclear power plants with pressurized water reactors.
  5. Project Management and Engineering Services Group at SE “RAO” for consulting services for tasks on decommissioning of units 1 to 4 and site selection, design, safety assessment, construction and commissioning of the National Radioactive Waste Repository (Subcontractor of a Consortium with Empresarios Agrupados and Nuvia)
  6. Engineering support for the Decommissioning and Radioactive Waste (RAW) Management Program of ISPRA (Italy)
  7. Development of a feasibility study for licensing and implementation of an advanced type of nuclear fuel for units 5 and 6 of Kozloduy NPP EAD operating at 3120 MW (Westinghouse Subcontractor)
  8. Expertise on selected aspects of the Periodic Safety Review (PSR) of Kozloduy NPP Unit 6
  9. “Development of design documentation for modernization of the control scheme for regulating flaps of Turbogenerator 9 (TG-9) at Kozloduy NPP, Unit 5”
  10. “Design of technological pipelines located on existing trestles built on the territory of Mondi-Stamboliyski EAD”
  11. “Expertise on selected reports from Stage 2 of the project for extending the service life of Unit 6 of Kozloduy NPP, related to substantiation of the possibility of safe operation of the reactor vessel and part of the main building structures”
  12. “Assessment of the compliance of the interim safety analysis report of Belene NPP with the current safety requirements for nuclear power plants”
  13. Modernization of the existing systems for technical diagnostics of main circulation pumps GCN-195 M, Kozloduy NPP, units 5 and 6
  14. “Development and implementation of a project for installation and replacement of displacement limiters, hydraulic shock absorbers and springs with roller blocks on pipelines 5TQ12,24,33; 5TX11,12,13,14; 5YP and 5YT”, (systems for emergency and planned cooling, emergency feedwater, volume compensator, hydraulic accumulators) Kozloduy NPP, Unit 5
  15. “Project on the topic: Replacement of a compressed air pipeline for testing systems 5.6 ХА (hermetic volumes of units 5 and 6 at Kozloduy NPP) for density in Section Х, K-9 to 5.6TP90S01”
  16. “Calculation and verification of seismic resistance of a pipeline from system 5.6 RY (steam generator purge), when replacing safety valves DN150”
  17. “Assessment of the compliance of the interim report for the analysis of the safety of Belene NPP with the current regulatory requirements for radiation protection”
  18. Preparation of “Calculations for the justification of the safety for the packaging of radioactive waste (RAW) with an activity greater than 0.1 TBq in reinforced concrete containers StBK during RAW management at the Joint Venture “PHRAW – Novi Han”

Trainings

Future in Energy industry!

We created the internship program in line with our mission to build a better future for young people in Bulgaria. We strive to provide employment in a dynamic and innovative environment, to support hard work, ambition and talent.

  • ENPRO Consult Ltd. gives students of Nuclear Energy and Thermal Power Engineering the opportunity to work in the company's office and get to know the business up close. The duration of the internships is 3 months (July, August and September). The deadline for submitting documents is the end of June each calendar year.

See what you will get if you intern with us:

Training from some of the best professionals in the energy industry

Development of skills through a variety of tasks and projects

Working with modern technologies and innovative methods

Spirit of cooperation and support in close-knit teams

Individual program

Constant feedback from a personal mentor

Monthly remuneration

Opportunity for a longer-term commitment to the company

Requirements for candidates:

– To be students in the 2nd, 3rd and 4th year, studying the specialty "Thermal Power Engineering or Nuclear Power Engineering"

– To have a minimum GPA of 4.00 in the last semester;

– To show high motivation and desire for development, as well as high personal discipline.

Application documents

  1. Motivation letter for applying for the program, for development in the relevant field, interests and extracurricular activities/projects and professional experience.
  2. Certificate from the Technical University - city Sofia or Sofia University "Kliment Ohridski" that for the current academic year the student is enrolled in a full-time form of study in one of the specified programs.
  3. A copy of a bachelor's degree diploma or a certificate of completion of a degree with a calculated average grade point average. For applicants after the first semester of the master's program, an additional certificate with a calculated average grade point average for the semester before application is required.

Only candidates approved on the basis of documents will be invited to an interview.

ENPRO Consult OOD informs you that some of the voluntarily provided data are personal and fall under a special protection regime within the meaning of Regulation 2016/679 and the Personal Data Protection Act. The personal data provided will be processed to achieve legally permitted purposes related to this internship, as well as to realize the legitimate interests of the personal data administrator. ENPRO Consult OOD processes, stores and uses the voluntarily provided personal data within the legally regulated deadlines, ensuring their security and confidentiality.

Thank you for your interest and we look forward to your applications.

Certificates