- Project Management and Engineering Services Group at SE RAO for consulting services for tasks on decommissioning of units 1 ÷ 4 and site selection, design, safety assessment, construction and commissioning of the National Repository for radioactive waste (Subcontractor of Consortium with Empresarios Agrupados and Nuvia)
- Installation of new heat exchangers TS10W01,02,03 (from hydrogen afterburning system) and shut-off and drainage fittings on the lines of the technical water system, providing the possibility of shut-off and flushing of the heat exchangers at Kozloduy NPP
- Design and implementation of a system for heating and cooling the metal of the water chambers and tube sheets of high-pressure chamber-type heaters (PVN-K) for Kozloduy NPP
- Modernization of control and management systems of Special Building 3 (SK-3) of Kozloduy NPP (Subcontractor of Westinghouse)
- Project for installation of L-shaped crane 5.6YW00E09 in the central hall, in the area of the Main Circulation Pumps 5.6YD10(40) at Kozloduy NPP
- Expertise of the technical documentation for unit 6 under the project: “Development of an advanced nuclear fuel cycle and justification of the safe operation of units 5 and 6 of Kozloduy NPP EAD with modified nuclear fuel with a capacity of 3120 MW”
- Investigation of the operating modes of the HVAC system in the Radioactive Waste Processing Plant (RWP) at the Kozloduy NPP site
- Design of steam and condensate pipelines serving the blowing system of the biofuel combustion boiler at Mondi Stamboliyski EAD
- Design of pipelines for PM2 paper machine at Mondi Stamboliyski EAD
- Design of a new pipeline for draining High Pressure Preheaters (HPH) at idle speed of the turbogenerator (TG) at low power up to 100 MW for units 5 and 6 at Kozloduy NPP
- Design of a new line from the steam generator purge system to the technological condenser for units 5 and 6 at Kozloduy NPP
- Performing a hydrodynamic check of foreign body migration in the cooling system of the 10GQ generator at Kozloduy NPP
- Computational check of underground pipeline No. 5 from the technical water system for responsible users (QF) at Kozloduy NPP
- Design of an overpass for moving diesel units in a horizontal direction at EUROMETAL
- Author’s supervision and technical assistance during the implementation of construction and installation works (C&I) of the investment project “Design and implementation of a system for heating and cooling the metal of the water chambers and tube sheets of high-pressure chamber-type heaters (PVN-K) at the NPP “Kozloduy”
- Implementation of repair and electrical installation activities on main and auxiliary equipment and systems of nuclear power units 5 and 6 during and/or related to the planned annual repairs in 2016. at Kozloduy NPP
- Delivery of repairable check valves for emergency feedwater system at Kozloduy NPP
- Reconstruction of hydrazine hydrate storage facility at Kozloduy NPP
- Strength analysis of tube bundle of high pressure heaters PVN–6 and PVN–7 at AES Galabovo TPP
- Design of a new expansion tank of turbogenerators TG–9 and 10 at Kozloduy NPP
- Preparation of an analysis of the possibilities for temporary storage of radioactive waste (RAW) resulting from the decommissioning activities of units 1-4 of Kozloduy NPP on the territory of the extension of the dry storage facility for spent nuclear fuel (HSSFSF Stage Ia)
- Design of a new pipeline for additional drainage of the outlet pipes of pipelines 5SA10 to 5RB10,20,30,40W01 in front of 5SH13S03,04 to 5SD11, which will ensure sufficient throughput for their normal drainage during the deployment of 9TG at Kozloduy NPP
- Design of steam pipelines 11b in PM2 at Mondi Stamboliyski EAD
- Modification and seismic strengthening of the metal structure of cranes 5,6UQ00E01 at Kozloduy NPP
- Rerouting of the pipelines for supplying condensate from the steam superheater separator SPP to the CN (5,6 SH31, 32S01) at Kozloduy NPP
- Expertise of selected reports from Stage 2 of the project for extending the operational life of Unit 5 of Kozloduy NPP, related to substantiation of the possibility of safe operation of the reactor vessel and part of the main building structures
- Additional analysis for assessing the behavior of “TVSA” and “TVSA-12” type cartridges with mixed fuel loadings under the conditions of expected operational events at Kozloduy NPP
- Design of technological pipelines of the system for capturing and transporting turpentine in the workshop: Cellulose of “Mondi Stamboliyski” EAD
- Reconstruction of the steam pipeline “Drainage of sharp steam” at AES “Galubovo”
- Performance of strength testing of membrane-type seam joints of heat exchangers for emergency and planned cooling of the primary circuit 5TQ10,20,30W01 at Kozloduy NPP
- Design of a new line after 5RY10S32;5RY10S33 and 6RY40S01;6RY40S02 at the entrance to 5(6)RR20W01 after 5(6)RN11S20” at Kozloduy NPP